Åbningen af den nye linje Tithorea–Lianokladi–Domokos... (Generelt)
PS
Der var endnu en video, og uploaderen svarede på mit eldrift-spørgsmål som følger:
'The overhead wire is live from Piraeus to Lianokladi [mellem Thitorea og Domokos], they switched it on at 15/12/2017. Currently they put two diesel ADtranz locomotives before the electric one at Tithorea and remove them at Paleofarsalos [nord om Domokos]. On 1/2/2018 the line Tithorea - Lianokladi through Kallidromon [den lange tunnel] will open and all trains will go through it. We don’t know if the electric locomotive will work through the new line in the first days, but it is possible.'